Commercial Air-Vapor Barrier Installation
Thursday, April 7th, 2016 by Vanessa Myre
View Photo Gallery
Challenge
This addition to a school was specified to use Rub-R-Wall Air-Vapor Barrier. The biggest Challange for the Masons was the labour intensive installation of peel and stick membranes.
Solution
Our spray application requires minimal labour and is applied in 1/3 of the time it takes their labours to install Peel and stick membranes. This saves contractors time and money.